Work Begins on Rio Blanco Tunnel in San Pedro Sula
Published on Honduras Daily · Jul 14, 2026 · Originally reported July 13, 2026 by La Prensa
Crews have broken ground on a L33.4 million (about $1.3 million) tunnel beneath the Rio Blanco bridge, part of San Pedro Sula's push to ease daily congestion for more than 18,000 drivers on the Armenta corridor.
“Read in English” opens La Prensa via Google Translate; “Leer en Español” opens the original. Honduras Daily curates and summarizes; the reporting is theirs.