Browse Honduras Daily Stories
Every published story, by topic, region, tag, and source — 1000 in the archive so far.
3 stories in Cortes · #flood-control
Clear filtersEl Tablón Dam Redesign Risks Further Delays, Business Leader Warns
Karim Qubain, president of the Cortés Chamber of Commerce and Industry (CCIC), expressed concern that a redesign of engineering studies for the El Tablón Dam could delay the project further, arguing that the Sula Valley cannot afford more postponement given its vulnerability to climate change.
Radio América HondurasRead on XPublished on Honduras Daily · Jul 18, 2026#represa-el-tablon#valle-de-sula#flood-controlOnly 6 of 32 Flood-Control Dikes Finished in the Sula Valley
Of 32 dike and flood-control projects underway across the Sula Valley ahead of the rainy season, only six are finished, 26 are roughly half-done, and several have not started, with the Infrastructure Ministry estimating completion in July.
La PrensaRead in EnglishLeer en EspañolPublished on Honduras Daily · Jun 17, 2026#flood-control#bordos#valle-de-sulaLab Tests Vet Materials for Sula Valley Flood Barriers
Honduras is conducting laboratory testing on soil and rock samples from dyke-reconstruction projects in the Sula Valley to ensure materials can withstand flooding and river swelling, with tests including soil classification, permeability, and structural-load capacity.
La PrensaRead in EnglishLeer en EspañolPublished on Honduras Daily · Jun 16, 2026#flood-control#bordos#valle-de-sula