Only 6 of 32 Flood-Control Dikes Finished in the Sula Valley

Published on Honduras Daily · Jun 17, 2026 · Originally reported June 15, 2026 by La Prensa

Of 32 dike and flood-control projects underway across the Sula Valley ahead of the rainy season, only six are finished, 26 are about half-done, and several have not begun, with the Infrastructure Ministry projecting completion in July.

Read the original at La Prensa

Opens via Google Translate (English). Honduras Daily curates and summarizes; the reporting is theirs.

Related stories

The Honduras Report

Honduras, in English, in your inbox.

The week's most consequential stories on Honduras with the context behind them, every Thursday. Free.