Browse Honduras Daily Stories
Every published story, by topic, region, tag, and source — 1000 in the archive so far.
4 stories in Infrastructure · San Pedro Sula · Tunota Canal 5 Tsi
Clear filtersENEE Plans Power Outages in San Pedro Sula Monday
The national power utility has scheduled two separate power outages in San Pedro Sula on Monday, September 28, from 8:45 a.m. to 2:45 p.m. in Condominios Hábitat and from 9:00 a.m. to 3:00 p.m. in the Bermejo Substation area for circuit maintenance and equipment installation.
TuNota (Canal 5 / TSI)Read in EnglishLeer en EspañolPublished on Honduras Daily · Sep 27, 2026#enee#power-outage#scheduled-maintenanceENEE Plans Monday Power Cut in San Pedro Sula
The national power company ENEE will cut electricity to a residential circuit in San Pedro Sula's Bellavista neighborhood on Monday, September 21, from 8:45 a.m. to 2:45 p.m. for scheduled line maintenance.
TuNota (Canal 5 / TSI)Read in EnglishLeer en EspañolPublished on Honduras Daily · Sep 20, 2026#enee#power-outage#scheduled-maintenanceENEE to Cut Power in San Pedro Sula for Sunday Maintenance
The national power utility has scheduled an 8-hour power outage on August 30 in San Pedro Sula neighborhoods and industrial zones for maintenance work on two circuits at the Calpules substation.
TuNota (Canal 5 / TSI)Read in EnglishLeer en EspañolPublished on Honduras Daily · Aug 30, 2026#power-outage#maintenance#eneeAmerican Airlines Jet Lands in San Pedro Sula With Damaged Nose
An American Airlines Boeing 737-800 from Miami landed at San Pedro Sula's Ramón Villeda Morales Airport on July 20 with visible denting on its nose cone, and its return flight was cancelled; a bird strike during approach has been suggested by unofficial sources but has not been confirmed by the airline or any Honduran authority.
TuNota (Canal 5 / TSI)Read in EnglishLeer en EspañolPublished on Honduras Daily · Jul 21, 2026#aviation#bird-strike#american-airlines