ENEE to Cut Power in San Pedro Sula for Sunday Maintenance
Published on Honduras Daily · Aug 30, 2026 · Originally reported August 29, 2026 by TuNota (Canal 5 / TSI)
The national power utility has scheduled an 8-hour outage on August 30 across San Pedro Sula neighborhoods and industrial zones for maintenance on two circuits at the Calpules substation.
“Read in English” opens TuNota (Canal 5 / TSI) via Google Translate; “Leer en Español” opens the original. Honduras Daily curates and summarizes; the reporting is theirs.