ENEE to Cut Power in San Pedro Sula for Sunday Maintenance

Published on Honduras Daily · Aug 30, 2026 · Originally reported August 29, 2026 by TuNota (Canal 5 / TSI)

The national power utility has scheduled an 8-hour outage on August 30 across San Pedro Sula neighborhoods and industrial zones for maintenance on two circuits at the Calpules substation.

“Read in English” opens TuNota (Canal 5 / TSI) via Google Translate; “Leer en Español” opens the original. Honduras Daily curates and summarizes; the reporting is theirs.

Related stories

The Honduras Report

Honduras, in English, in your inbox.

The week's most consequential stories on Honduras with the context behind them, every Thursday. Free.

Honduras, in English — one email every Thursday. Free, and unsubscribe anytime.