Germania Bridge Work and Southern Route Widening Set for September
Published on Honduras Daily · Jun 12, 2026 · Originally reported June 12, 2026 by Radio América Honduras
Infrastructure Minister Aníbal Ehrler said reconstruction of the Germania Bridge and the widening of the southern highway exit to three lanes will be finished by September.
Read the original at Radio América Honduras
Opens the original source. Honduras Daily curates and summarizes; the reporting is theirs.