ENEE to Cut Power in Tegucigalpa on Sunday
Published on Honduras Daily · Sep 13, 2026 · Originally reported September 12, 2026 by TuNota (Canal 5 / TSI)
The national power utility ENEE will shut off electricity in central Tegucigalpa on September 13 from 8 a.m. to 4 p.m. for scheduled maintenance on the Pueblo Nuevo substation circuit, affecting commercial, residential, and institutional areas including Boulevard Morazán and several shopping centers.
“Read in English” opens TuNota (Canal 5 / TSI) via Google Translate; “Leer en Español” opens the original. Honduras Daily curates and summarizes; the reporting is theirs.