San Pedro Sula Roundabout Work to Run Two More Months
Published on Honduras Daily · Aug 14, 2026 · Originally reported August 13, 2026 by La Prensa
A L29 million (about $1.16 million) road project at the Los Cármenes intersection in San Pedro Sula — covering paving, a roundabout, signage, curbs, and retaining walls — is snarling traffic and will continue for at least two months, municipal officials say.
“Read in English” opens La Prensa via Google Translate; “Leer en Español” opens the original. Honduras Daily curates and summarizes; the reporting is theirs.