Thursday, October 29, 2026 — Evening Edition

Evening Edition

Top Story · Environment

El Cajón to End 2026 at Low Capacity, Faces 70-Megawatt Loss in 2027

Honduras's El Cajón hydroelectric dam will close 2026 at just 70.44% capacity (271.45 meters) after below-average rainfall tied to El Niño, and power officials expect a 70-megawatt output loss in 2027 as water levels drop further, straining the grid's backup reserves during peak-demand months.

Politics

Business

Infrastructure

Health

Education

Sports

Migration

Crime