Browse Honduras Daily Stories
Every published story, by topic, region, tag, and source — 1000 in the archive so far.
4 stories in Infrastructure · #hydroelectric
Clear filtersInfrastructure Ministry Takes Over El Tablón Project
The Infrastructure Ministry officially took over the El Tablón multipurpose project from the national utility, which aims to generate electricity, supply water, and control flooding while ensuring continuity of technical, administrative, and contracting work.
SIT — Secretaría de Infraestructura y Transporte (X)Read on XPublished on Honduras Daily · Jul 28, 2026#hydroelectric#water-supply#flood-controlAging Equipment Threatens Shutdowns at El Cajón Power Plant
Honduras's largest power plant, El Cajón, which supplies about 30% of the nation's electricity, is at risk of forced shutdowns due to aging equipment past its useful life and delays in purchasing critical replacement parts, engineers warn.
La PrensaRead in EnglishLeer en EspañolPublished on Honduras Daily · Jun 23, 2026#el-cajon-dam#enee#energy-crisis70% of Cajón Dam Worker Housing Falls Into Disrepair
About 70% of buildings at the Cajón Dam's worker camps show significant deterioration, with 12 homes deemed uninhabitable and repairs estimated to cost over 60 million lempiras (about $2.4 million), according to technical assessments.
El HeraldoRead in EnglishLeer en EspañolPublished on Honduras Daily · Jun 18, 2026#el-cajon-dam#enee#hydroelectricTurf War at El Cajón Hydro Plant Threatens Operations
A dispute over overlapping duties between the interim technical chief and the administrative director at Honduras's largest hydroelectric plant, El Cajón, is stalling procurement of vital parts needed to keep all four turbines running, according to internal communications obtained by El Heraldo.
El HeraldoRead in EnglishLeer en EspañolPublished on Honduras Daily · Jun 16, 2026#enee#el-cajon#hydroelectric