Turf War at El Cajón Hydro Plant Threatens Operations
Published on Honduras Daily · Jun 16, 2026 · Originally reported June 16, 2026 by El Heraldo
A clash over overlapping duties between the interim technical chief and the administrative director at El Cajón, Honduras's largest hydroelectric plant, is stalling the purchase of parts needed to keep all four turbines running, according to internal communications obtained by El Heraldo.
Read the original at El Heraldo
Opens via Google Translate (English). Honduras Daily curates and summarizes; the reporting is theirs.