El Cajón to End 2026 at Low Capacity, Faces 70-Megawatt Loss in 2027

Published on Honduras Daily · Oct 29, 2026 · Originally reported October 29, 2026 by El Heraldo

Honduras's El Cajón hydroelectric dam will close 2026 at just 70.44% capacity (271.45 meters) after below-average rainfall tied to El Niño, and power officials expect a 70-megawatt output loss in 2027 as water levels drop further, straining the grid's backup reserves during peak-demand months.

“Read in English” opens El Heraldo via Google Translate; “Leer en Español” opens the original. Honduras Daily curates and summarizes; the reporting is theirs.

Related stories

The Honduras Report

Honduras, in English, in your inbox.

The week's most consequential stories on Honduras with the context behind them, every Thursday. Free.

Honduras, in English — one email every Thursday. Free, and unsubscribe anytime.