5.5 km of Tegucigalpa Road Repaved to Ease Traffic
Published on Honduras Daily · Oct 29, 2026 · Originally reported October 28, 2026 by SIT — Secretaría de Infraestructura y Transporte (X)
The 5.5-kilometer corridor between Lomas de Toncontín and Villeda Morales is being repaved and patched, officials say, to ease travel for residents of the capital.
Opens the original post on X, which offers its own “Translate post” option. Honduras Daily curates and summarizes; the reporting is theirs.