With School Rebuild Stalled, Students Hold Classes in a Funeral Home
Published on Honduras Daily · Oct 24, 2026 · Originally reported October 22, 2026 by TuNota (Canal 5 / TSI)
Students at Padre Reyes school in Santa Rosa de Aguán, Colón, have held classes in a borrowed funeral-home room since 2023 as construction on their campus drags on unfinished; the space is unfit, with classes suspended during viewings and rain leaking through the roof.
“Read in English” opens TuNota (Canal 5 / TSI) via Google Translate; “Leer en Español” opens the original. Honduras Daily curates and summarizes; the reporting is theirs.