A Year On, Reynel Fúnez Bridge Box Still Unfinished
Published on Honduras Daily · Oct 19, 2026 · Originally reported October 18, 2026 by El Heraldo
A year after a landslide destroyed a bridge box serving four neighborhoods south of Tegucigalpa, the city has finished only the first phase—a temporary dual 72-inch pipe installation—while residents wait on paving and drainage work to restore full access.
“Read in English” opens El Heraldo via Google Translate; “Leer en Español” opens the original. Honduras Daily curates and summarizes; the reporting is theirs.