Power Blackouts Costing Valle de Sula Businesses Millions
Originally reported September 10, 2026 by Radio Cadena Voces (RCV)
Three blackouts lasting 6 to 8 hours in September have cost small and medium-sized businesses in the Valle de Sula an estimated 30 million lempiras (about $1.2 million), with most lacking backup generators to sustain operations, a sector representative said.
“Read in English” opens Radio Cadena Voces (RCV) via Google Translate; “Leer en Español” opens the original. Honduras Daily curates and summarizes; the reporting is theirs.