Work Advances on Juan Manuel Gálvez Bridge Repairs
Published on Honduras Daily · Jul 9, 2026 · Originally reported July 8, 2026 by SIT — Secretaría de Infraestructura y Transporte (X)
The Infrastructure Ministry poured high-strength concrete to reinforce the ramp foundations of the Juan Manuel Gálvez Bridge, with structural work to follow.
Read the post on X
Opens the original post on X, which offers its own “Translate post” option. Honduras Daily curates and summarizes; the reporting is theirs.