Work Begins on Danto River Flood Wall in La Ceiba
Published on Honduras Daily · Jun 26, 2026 · Originally reported June 25, 2026 by La Prensa
After more than a decade of broken promises, authorities have begun repairing the Danto River containment wall in western La Ceiba, a three-month project of retaining walls, riprap, and gabions to protect about ten flood-prone neighborhoods.
Read the original at La Prensa
Opens via Google Translate (English). Honduras Daily curates and summarizes; the reporting is theirs.
Also reported by: Radio América Honduras, Infobae – Honduras