Prosecutors Seize Documents in Hospital Construction Probe
Published on Honduras Daily · Jun 18, 2026 · Originally reported June 18, 2026 by TuNota (Canal 5 / TSI)
The Public Ministry and the Criminal Investigation Agency seized documents from the Infrastructure Ministry as part of an investigation into alleged irregularities in three public hospital projects in Olancho, Santa Bárbara, and Ocotepeque that cost more than 2 billion lempiras; construction was suspended in May pending review.
Read the original at TuNota (Canal 5 / TSI)
Opens via Google Translate (English). Honduras Daily curates and summarizes; the reporting is theirs.